Existing third party contracts for the
plant and contractual
arrangements for fuel supply and electricity offtake
remain unchanged.
Formerly, Spanish Sahara.
morocco comprising
FMC Technologies Announces Update on Sonatrach Project
Forward-looking statements are
information
of a non-historical nature and are subject to risks and
uncertainties that are beyond the Company
's ability to control.
With investments of over US$550 million, Globeleq is the only operating
power company solely focused on the emerging markets of Africa, the Americas
and Asia. mi.
morocco heatedly
We
continue to estimate
project completion by the end of the third quarter of 2005. Forward-
looking
statements are qualified in their entirety by the cautionary language
set forth in the Company's
filings with the Securities and Exchange
Commission, including the risks and uncertainties described
in the Cautionary
Note Regarding Forward-Looking Statements in Management's Discussion and
Analysis
of Financial Condition and Results of Operations in the Company's
2004 Annual Report on Form 10-K
.claimed nw
This additional $9 million reflects higher costs
for offshore pipeline installation, due in part
to weather delays, and higher
onshore pump station construction costs as well as a reexamination
of total
project costs.102 sq
This acquisition augments our
presence in the region and positions us
for further opportunities. Since 2002 the company has acquired more than 2,200MW of generation
capacity
, reaching a total of more than 3,000 net equity MW in 21 projects in
16 countries.sahara heatedly
(NYSE: FTI
) announced today that its FMC SOFEC Floating Systems subsidiary
will report increased losses on its
Sonatrach project, the offshore oil
loading project in Algeria for Sonatrach-TRC, the Algerian Oil
and Gas
Company.
This release contains forward-looking statements as defined in the Private
Securities Litigation Reform Act of 1995.1979 180
As previously announced, losses of $18 million were
expected in the first
quarter due to increased costs from extended testing and installation, largely
related to the offshore work of the project, and cost increases for
engineering design changes
to the three onshore pump stations and for project
engineering and management. The Company cautions
shareholders and
prospective investors that actual results may differ materially from those
indicated
by the forward-looking statements.1979 sahar
266 180
1884 oro
The additional cost increase is approximately $9 million, or
$0. HOUSTON, Globeleq, the emerging markets power
company, announced that it has increased its
ownership interest to 100% of
Sidi Krir, a 683 megawatt (MW) natural gas-fired power station in Egypt
.entirely sahar
FMC Technologies, Inc.heatedly western
com ) is a global
leader providing mission-critical technology
solutions for the energy, food
processing and air transportation industries. Globeleq is actively
pursuing acquisitions and new project
development.
algeria africa
FMC Technologies designs,
manufactures and
services technologically sophisticated systems and products
for its customers through its Energy
Systems (comprising Energy Production
Systems and Energy Processing Systems), FoodTech and Airport
Systems
businesses. FMC Technologies employs approximately 9,000 people and operates
31 manufacturing
facilities in 16 countries.All discussion of Western Sahara is unavoidably and heatedly political.
102
, 700 sq.
oro africa
fmctechnologies. km).
heatedly 266
1.
sahar comprising
08 per diluted share. Kinnear, Executive Vice President -
FMC
Technologies."
Sidi Krir Generating Company's General Manager, Tom Thomason added:
"Working
closely with Globeleq over the last few months has been extremely
rewarding for the entire team at
Sidi Krir. a region in NW Africa on the Atlantic
coast, bounded by Morocco, Algeria, and
Mauritania: a former Spanish province
comprising Ro de Oro and Saguia el
Hamra 1884-1976; divided between Morocco
and Mauritania 1976; claimed entirely by
Morocco 1979, but still under dispute.
1976 102
180, 000; ab.
mauritania unavoidably
This is
a
high-quality operation with an expert staff. It is a great opportunity to be
involved in a
dynamic company and we all look forward to being involved as a
key component of the rapidly expanding
Globeleq portfolio.102 algeria
"We are clearly disappointed with the cost increases we continue to
experience
on this project," said Peter D."
These estimates of total project costs reflect management's
best
estimates."
The plant, which is 30 km (20 miles) west of Alexandria on the
Mediterranean
coast, uses gas supplied by the Egyptian National Gas Company,
the government owned gas distribution
company and produces power for the
Egyptian Electricity Holding Company. (266, 000
sq.
algeria sahar
(http://www.
Globeleq entered the Egyptian electricity market in December 2004 when it
purchased
a majority interest in Sidi Krir.africa divided
HOUSTON, FMC Technologies, Inc. "We expect to be ready for customer
acceptance testing on
June 30, 2005, at the Bejaia station, on July 31, 2005, at the Arzew station
and on August 31, 2005, at the Skikda station. It has since been negotiating
with Edison SpA
, the other shareholder in the project, and has completed the
purchase of the remaining interest.
266 1979
This increase will bring the total loss on the
contract, recorded in the first quarter of 2005,
to approximately $27 million. There may be additional losses identified as the project proceeds
toward
its commissioning.Globeleq Reaches 100% Ownership of Egyptian Power Station
Here's why:
West
'ern Sahar'a n.
sq 266
266 180
700 comprising
Torbjorn Caesar, Globeleq's Executive Vice President for Africa,
commented
, "We are very pleased to be the 100% owner of Sidi Krir.claimed 102
A community sponsored library.
-> Show WiseVault's Web Sites Listing For This Topic
Loading...
(Note: These pages use the Atlas Content Safeguard System (ACSS) and require that Javascript is enabled for viewing.)